BFT P125002

BFT SB-BAT P125002 24V DC Battery Backup Kit Instruction Manual

For BFT Gate Opener Systems

1. Gabatarwa

This manual provides essential instructions for the installation, operation, and maintenance of the BFT SB-BAT P125002 24V DC Battery Backup Kit. This kit is designed to ensure continuous operation of compatible BFT gate openers during temporary power outages. Please read this manual thoroughly before proceeding with installation or use.

2. Samfurin Ya Ƙareview

The BFT SB-BAT P125002 is a 24V DC battery backup system that integrates with specific BFT gate operators. It includes a smart charger board that manages battery charging when main power is available and automatically switches to battery power when the main supply is interrupted.

BFT SB-BAT P125002 Battery Backup Kit components in box

Hoto 1: Samaview of the BFT SB-BAT P125002 Battery Backup Kit, showing the product box, two batteries, wiring, and mounting hardware.

2.1. Abubuwan Kit

Individual components of the BFT SB-BAT P125002 Battery Backup Kit

Hoto 2: Cikakken bayani view of the BFT SB-BAT P125002 kit components, including batteries, wiring, mounting brackets, and the battery holder.

3. Daidaituwa

This battery backup system is compatible with the following BFT gate operator series:

Ensure your gate operator model is listed above for proper functionality.

4. Saita da Shigarwa

Installation of the BFT SB-BAT P125002 kit is designed to be straightforward. However, it is recommended that installation be performed by a qualified technician to ensure safety and correct operation. Always disconnect main power to the gate operator before beginning installation.

4.1. Kariyar Tsaro

4.2. Matakan Shigarwa (Jagororin Gabaɗaya)

  1. Mount the Battery Holder: Secure the battery holder/mounting base within the gate operator's control box or an appropriate enclosure using the provided mounting brackets and fasteners. Ensure it is stable and accessible.
  2. Saka Batura: Place the two 12V 1.2Ah batteries into the battery holder.
  3. Haɗa Batura: Connect the batteries in series to achieve 24V DC, following the wiring diagram provided with your specific gate operator or the kit's smart charger board. Ensure correct polarity.
  4. Connect Smart Charger Board: Integrate the smart charger board into the gate operator's control unit. Refer to your gate operator's manual for the specific connection points for the battery backup system.
  5. Amintaccen Waya: Route and secure all wiring to prevent pinching or damage.
  6. Dawo da Power: Once all connections are verified and secure, restore main power to the gate operator. The smart charger board will begin charging the batteries.
  7. Tsarin Gwaji: Perform a power outage simulation to verify the battery backup system activates correctly and powers the gate operator.

5. Umarnin Aiki

The BFT SB-BAT P125002 operates automatically once installed correctly.

5.1. Normal Operation (Power On)

When main power is supplied to the gate operator, the smart charger board within the SB-BAT kit continuously monitors the battery charge level. It will charge the batteries as needed to maintain them at full capacity.

5.2. Ikon Kutage Operation (Power Off)

A yanayin da wani iko kutage, the smart charger board automatically detects the loss of main power and switches the gate operator to battery power. The gate operator will then function normally using the stored energy in the batteries. The duration of operation on battery power depends on the frequency of gate usage and the charge level of the batteries.

6. Kulawa

Regular maintenance ensures the longevity and reliability of your battery backup system.

6.1. Battery Recharging

Bayan iko kutage, once main power is restored, the smart charger board will automatically begin recharging the batteries. A full recharge typically takes 12 zuwa 14 hours. It is important to allow sufficient time for batteries to fully recharge after use.

6.2. Fuse Check

Tsarin ya ƙunshi a 20 a fus for protection. If the battery backup system fails to operate or charge, inspect the fuse for continuity. Replace with a fuse of the exact same rating if necessary. Always disconnect power before checking or replacing fuses.

6.3. Battery Life and Replacement

Batteries have a finite lifespan. Periodically test the system by simulating a power outage to ensure batteries hold a charge and can power the gate operator. If performance degrades significantly, consider replacing the batteries. Use only recommended replacement batteries (2x 12V 1.2Ah sealed lead-acid).

7. Shirya matsala

If your BFT SB-BAT P125002 battery backup system is not functioning as expected, consider the following:

For persistent issues, contact BFT technical support or a qualified service technician.

8. Ƙayyadaddun bayanai

SiffarƘayyadaddun bayanai
Lambar SamfuraP125002
Nau'in BaturiLead acid mai rufe
Ƙarfin baturi2x (12V 1.2Ah)
Fitarwa Voltage24V DC (nominal)
Cajin Voltage27.2V
Cajin Yanzu130mA
Lokacin Cajin Baturi12-14 hours
Exhausted Battery Protection Threshold20.4V
Rage Fuse20 A
Yanayin AikiData detected with external temperature of: 25°C (77°F)

9. Garanti da Tallafawa

For warranty information, please refer to the documentation provided with your original purchase or contact BFT customer support directly. For technical assistance, installation queries, or troubleshooting beyond the scope of this manual, please contact your authorized BFT dealer or BFT technical support.

BFT Contact Information: Please visit the official BFT website for the most current contact details and support resources.

Takardu masu alaƙa - P125002

Preview BFT DEIMOS BT UL/CSA Electromechanical Gate Automation System
Discover the BFT DEIMOS BT UL/CSA, an electromechanical automation system for rack sliding gates. Featuring smart technology, 24V safe operation, and simplified installation, this system enhances gate security and convenience. Explore its technical specifications and available accessories for residential and commercial applications.
Preview BFT Mitto 2M/4M Umarnin Coding Nesa: Cikakken Jagora
Koyi yadda ake tsara abubuwan sarrafa nesa na BFT Mitto 2M da 4M don gareji da masu buɗe kofa. Wannan jagorar ta ƙunshi lambar ƙididdigewa ga masu karɓa tare da kuma ba tare da allon dijital ba, gami da gargaɗin aminci mai mahimmanci.
Preview Manhajar Shigar da Gate Automation ta BFT VIRGO
Cikakken shigarwa da jagorar mai amfani don tsarin sarrafa kansa na BFT VIRGO swing gate, wanda ya shafi aminci, ƙayyadaddun fasaha, hanyoyin shigarwa, shirye-shirye, da kulawa.
Preview Shigar da Uso BFT GIOTTO 30-60 S BT / GIOTTO 30-60 BT
Guida kammala kowane shigar da aikace-aikacen barriere ta atomatik na BFT GIOTTO 30-60 S BT da GIOTTO 30-60 BT. Haɗa takamaiman fasahar fasaha, configurazione da manutenzione.
Preview BFT MITTO 2B Umarnin Coding Nesa | Retro Remotes
Jagorar mataki-mataki don coding BFT MITTO 2B nesa don masu buɗe ƙofa, rufe hanyoyin allo na nesa da mai karɓa na LCD. Ya haɗa da shawarwarin magance matsala.
Preview Jagorar Shigar da Tsarin Kula da Rediyo na BFT CLONIX1-2 & MITTO 2-4 433MHz
Cikakken jagorar shigarwa don mai karɓar BFT CLONIX1-2 da masu watsa rediyo na MITTO 2-4 433MHz, wanda ya ƙunshi shirye-shirye, cloning, aminci, da ƙayyadaddun fasaha don sarrafa ƙofa da ƙofa.